The tear-out and remodeling of the kitchen is scheduled to happen mainly in November; however, today I found out that a 40 ft. semi really can make it around the corner and up our hill. We had cabinets delivered because Jim finalized the plans (and they shipped them) for the cabinets.
I am feeling a little cramped around the house because we have one room that is basically empty (and sealed off for sanding). That furniture is in the living room (which got rearranged in that the TV is on a different wall now to reorient the room). I have boxes of flooring and underlayment stacked up. There is an area where I have a huge 5 gallon bucket of paint and various painting tools out. Now there are also cabinets. They are mainly in boxes waiting to be assembled. At least some of them are wrapped and on a pallet and sitting in our carport (as far away from an openings as I could get them. This weekend Jim and I will decide if that is where they stay.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment